Work
Profile
I'm a registered architect with close to 10 years of practical experience (2 post-graduate years) in Sydney, Australia. I'm currently employed as an Associate at COSO Architecture — a position I've held since early 2025 after starting there as a student in 2019. Throughout my career, I've managed a number of residential projects from concept through to construction, led design on key commissions within the practice, and mentored junior staff along the way. In late 2025, I completed my NSW ARB registration and finally became an Architect — a milestone I'd been working toward since the beginning of my studies.
I am seeking my next career move to a design driven practice that shares my passion and enthusiasm for residential design. One that will nurture my continued professional development and provide me opportunity to contribute to interesting and engaging architecture. I would welcome the opportunity to meet and discuss potential employment opportunities that may suit my experience and interests. See below my web-based design portfolio for a snapshot of my skills and experience as well as my included cover letter and CV for your review. I look forward to speaking further.
Experience
Responsibilities include:
- End-to-End Project Management: Lead residential projects valued from $1.3M to $6M from initial client briefing through to final completion, managing project timelines, budgets, competitive tendering, and progress claims.
- Design & Technical Documentation: Drive design development and oversee the preparation of detailed construction drawings and technical documentation packages.
- Client & Consultant Leadership: Serve as primary client contact and procure, direct, and coordinate multidisciplinary consultant teams, including structural engineers and specialists.
- Contract Administration & Site Oversight: Administer building contracts, conduct site visits, and lead regular builder meetings to monitor progress and resolve on-site construction issues.
- Practice Development & Mentorship: Mentor junior staff, coordinate project teams, and assist the Director with strategic practice growth.
Previously held positions within the practice as Graduate Architect (2023–24) and Architectural Assistant (2019–2023) while completing university degree studies.
Education
Software Capabilities
- Vectorworks
- ArchiCAD
- Rhino
- Enscape Renderer
- Adobe Suite
References
Balmoral House
- Type
- Alterations and Additions
- Location
- Mosman, NSW
- Role
- Project Architect
- Practice
- COSO Architecture
- Budget
- Approx. $6,000,000
- Timeline
- Nov 2024 — Ongoing
- Involvement
- SD, DA, CDC, On-site (ongoing)
Extensive alterations and additions to four-storey residential property executed under concurrent CDC and DA approvals.
Led design development and client collaboration, managed competitive tender with 4 builders, and administered dual building contracts across multiple stages. Conducted fortnightly site visits and on-site coordination with structural engineer and builder.
Key Accomplishments
- Managed accelerated project delivery by navigating dual concurrent approval pathways with distinct timelines, compressing overall project schedule.
- Synthesized client aspirations with practical constraints during comprehensive brief development and refinement from project inception.
- Championed one of the practice's marquee commissions as design lead, establishing quality benchmarks and client confidence across all design and delivery phases.
- Achieved professional registration mid-project and immediately applied hands-on contract administration and approvals management on-site.




















Alexandria Terrace
- Type
- Alterations and Additions
- Location
- Alexandria, NSW
- Role
- Project Architect
- Practice
- COSO Architecture
- Budget
- Approx. $1,300,000
- Timeline
- Sep 2022 — Jul 2026
- Involvement
- DA to completion
Renovation of inner-city terrace with flexible living and dining spaces for growing family.
Led design development within tight building constraints, facilitated competitive tendering process, and administered building contract alongside director. Managed on-site contract administration, progress claims, and client budgets throughout construction.
Key Accomplishments
- Operated autonomously across client relations and financial forecasting, building confidence through transparent budget management and proactive communication.
- Coordinated a rigorous competitive tender across fully detailed and specified documentation, evaluating builder proposals and negotiating commercial terms independently.












Vaucluse Pavilion
- Type
- Alterations and Additions
- Location
- Vaucluse, NSW
- Role
- Project Architect
- Practice
- COSO Architecture
- Budget
- Approx. $2,000,000
- Timeline
- Aug 2025 — Ongoing
- Involvement
- SD, DA (ongoing)
A schematic design scheme for an existing home in Vaucluse, Sydney, including an extensive redesign of the rear garden and outdoor pavilion structure.
Beneath the house, the existing garage is reimagined as a comprehensive entertaining space with an adjoining gym and wellness centre. The project is progressing towards DA submission in late 2026.
Key Accomplishments
- Led initial client engagement meetings and managed a comprehensive return brief process.
- Coordinated complex design integration with existing unfinished structures on site, liaising with the existing consultant team to develop the most efficient structural solution for the site conditions.
- Managed junior staff in preparing presentation material across numerous design revisions, with all renders produced in-house.











Crows Nest Cottage
- Type
- Alterations and Additions
- Location
- Crows Nest, NSW
- Role
- Project Architect
- Practice
- COSO Architecture
- Budget
- Approx. $3,000,000
- Timeline
- Sept 2024 — Ongoing
A comprehensive renovation of a dilapidated heritage cottage in Crows Nest, Sydney.
The scope includes a full restoration of the original cottage, a contemporary two-storey rear extension, and a new pool. The project is currently in extended tender negotiations, with construction expected to begin in early 2027.
Key Accomplishments
- Managed the project from initial concept design through DA assessment with council, and on through construction documentation and tender.
- Collaborated with the interior designer on interior documentation and the full fixtures and finishes schedule.
- Ran a competitive tender process with four builders, working closely alongside the director.
















Mosman House
- Type
- Alterations and Additions
- Location
- Mosman, NSW
- Role
- Project Architect
- Practice
- COSO Architecture
- Budget
- Approx. $3,500,000
- Timeline
- Jun 2024 — Ongoing
- Involvement
- CD completion
Comprehensive alterations and additions to multi-storey residential dwelling with evolving brief requirements under cost-plus contract.
Led on-site project management for overseas clients, navigating constantly evolving scope and latent site conditions. Managed contract administration and progress claims with builder conducting fortnightly site meetings.
Key Accomplishments
- Navigated the complexities of cost-plus delivery, documenting design evolution in real-time while maintaining technical rigor as brief requirements shifted.
- Cultivated direct relationships with principal certifier on compliance pathways, serving as bridge between design intent and regulatory approval.
- Took ownership of detailed specification and procurement of fixtures, fittings, and finishes, ensuring client preferences were realised across all project elements despite geographic distance.



















Beyond Four Walls
- Type
- Master's Thesis Project
- Location
- Bomaderry, NSW
- Institution
- UTS
- Year
- 2023
- Involvement
- University
A proposal for a shared community fostering growth and wellbeing through the study of inside, outside, and interstitial space.
The scheme reactivates Moss Vale Road as a new pedestrian main street running from Cambewarra to Bomaderry station, encouraging foot and bike traffic as a means of community building.
At its centre, a community sports ground and civic square stage public congregation, with surrounding residential settings given direct access to the amenity. The housing is organised around five spatial orders of respite — from the personal interior to the communal exterior — letting each occupant dictate the balance of shared space and seclusion.







Sydney Fire Station
- Type
- Model Making · Physical model, 1:5
- Focus
- Façade / Materiality
- Institution
- UTS
- Involvement
- University
Sydney's fire station carries an architecture of practicality and security, shaped largely by its program — including an intricate system of external louvres across the facade.
This physical model is a 1:5 exploration of that concept: a re-articulation of the operable louvre structure that integrates visual cues from the form of a fire truck.
The model investigates the tactility of materials and the operability of built structure, testing how a façade can move and respond rather than remain fixed.



